5.0 on the App Store

Know exactly what to lift next.

Build your own training program and choose how each exercise progresses. MyoFactor uses your previous workouts to calculate your next working weight automatically.

Your program. Your progression rules. No spreadsheet required.

Start your 7-day free trial

Then $4.99/month or $29.99/year. Cancel anytime.

MyoFactor workout complete screen with recap and next weights

Stop deciding. Start lifting.

MyoFactor handles the small decisions that interrupt a workout, without taking control of your training away from you.

Open the app. See your next weight.

Your next workout is updated from your previous session automatically.

MyoFactor remembers what you lifted, checks whether you hit your target, and tells you what to load next. You can focus on the set instead of reopening a spreadsheet or searching through old notes.

You choose the rule. MyoFactor runs it.

  • Add weight every session with linear progression
  • Add weight after reaching the top of a rep range with double progression
  • Track an exercise without automatic changes
  • Add optional deload rules after missed targets
Active workout logging with previous weights and tap to log
My Programs list with Full Body Strength, Push Pull Legs, and Upper Lower

Build the program you actually want to run.

Start from a blank program or choose a prebuilt template. Then change anything.

Pick your exercises, training days, rep ranges, progression methods, and deload rules. No default program is forced on you.

Your program stays yours.

Load the bar without doing the math.

MyoFactor calculates your warm-up sets and shows the plates needed on each side of the bar, including microplates.

You also get:

  • A rest timer that alerts you from the lock screen
  • Exercise notes and form cues during the workout
  • Your previous performance beside the current set
  • Fast logging designed for use between sets

Built for the rack, not for staring at a dashboard.

Plate calculator showing warmup and working sets per side of the bar
Progress charts with session activity and exercise PRs over time

See whether the program is working.

Track sessions, volume, personal records, and performance over time.

MyoFactor turns your training history into a clear answer to the question that matters:

Am I progressing?

Set it once. Progress every session.

1. Build your program

Create your own split or customize a prebuilt template.

2. Choose how each exercise progresses

Use linear progression, double progression, or manual tracking.

3. Log your workout

Record your sets, reps, and weight while you train.

4. Come back to your next weight

MyoFactor applies your rules and prepares the next session automatically.

Your next workout is already waiting.

Build the program you want to run. MyoFactor will keep it moving forward.

Start your 7-day free trial

Then $4.99/month or $29.99/year. Cancel anytime.

FAQ

Is MyoFactor free?

MyoFactor includes a 7-day free trial. After the trial, it costs $4.99 per month or $29.99 per year.

You can cancel anytime.

Do I have to use a MyoFactor program?

No.

Build a program from scratch or add a prebuilt template to your library. You can customize the exercises, schedule, rep ranges, and progression rules in either one.

How does progression work?

You choose a progression method for each exercise:

Linear progression
Add weight after each successful session.

Double progression
Add weight after reaching the top of your target rep range.

Track only
Log the exercise without automatic weight changes.

You can also add an optional deload after a chosen number of missed sessions. MyoFactor stores the result and prepares your next working weight automatically.

What happens when I miss my target?

MyoFactor follows the rule you selected for that exercise.

Depending on your setup, it can keep the weight the same, wait for you to reach your rep target, or trigger a deload after a chosen number of missed sessions.

Can I share a program with a friend?

Yes.

Share a code or link and your friend will receive an independent copy of the program structure. Your weights and workout history stay private.

Does it calculate warm-up sets?

Yes.

MyoFactor creates warm-up ramps and shows the plates required on each side of the bar, including microplates.

Which platforms does MyoFactor support?

MyoFactor is available on iOS and Android.

Can I cancel anytime?

Yes. There is no long-term commitment.

Founder's note

I wanted the freedom of a spreadsheet without having to manage one.

Most workout apps made me choose between two bad options.

One gave me complete freedom, then left me to calculate every increase, repeat, and deload myself. The other made all the decisions, but forced me into a program I did not want to run.

I built MyoFactor to combine the useful parts of both.

You build the program. You choose how every exercise should progress. MyoFactor remembers what happened and prepares the next workout for you.

No guessing what weight to use.
No spreadsheet before every session.
No app taking ownership of your training.

Just your program, moving forward.

That is the MyoFactor promise.

— Zach, Founder of MyoFactor

Build your program. Know your next weight.

Start your 7-day free trial

Then $4.99/month or $29.99/year. Cancel anytime.